Arctic Diesel Oil Pumpsets, Kharyaga Production facility, Russia

Client:
Total Oil / Halliburton Brown & Root
Description:
Two off Arctic Diesel pumpsets, designed to withstand harsh arctic conditions in Northern Russia. Pumps complied with GOST and Gosgortechnezor requirements, for Russian approval
Performance:
5m3/hr (83 l/min) at 150 Barg. Designed to operate at -20degC and maintain integrity at -54degC under static conditions

ECA Develpoment, BP Cleeton offshore platform.

Client:
BP Exploration & Operating Co. Ltd. / AMEC Process & Energy Ltd
Description:
Four off T.E. Glycol pumpsets. Units fitted complete with packing lubrication and high integrity sealing system
Performance:
Belt driven variable speed drive units, producing up to 5.1m3/hr (85 l/min) at 115 Barg.

Glass Dower Soekor Fso

Client:
Bluewater Energy Services BV, Amsterdam
Description:
Crude Oil Injection Pump
Performance:
Triplex pump packages: One off package producing up to 75m_/hr at 165 Barg

Methanol Injection Pumpsets for Schiehallion Floating Production & Storage Offshore vessel.

Client:
BP Exploration & Operating Co. Ltd. / Brown & Root
Description:
Three high pressure and two chemical dosing Methanol injection pumps, mounted on a common skid. Installation included all process piping and control systems to North Sea Zone 1 hazardous area offshore specifications.
Performance:
Three off inverter driven variable speed units, producing up to 4.7 m 3/hr (78l/min) at 360 Barg per pump.

Two off dosing pumps, variable stroke Bran & Luebbe units.

Miscible gas injection pumpsets, Wytch Farm Production facility, Dorset

Client:
BP Exploration & Operating Co. Ltd. / Tri-Ocean Engineering Ltd.
Description:
One duty / one standby Propane & Butane mixture pumpsets.
Performance:
Inverter driven variable speed units, producing 55 m 3 / hr (917 l/min) at 120Barg. All equipment designed to withstand low temperature ‘blowdown’ condition. Process fluid temperature 50degC

Mobile test unit for pipeline equipment

Client:
Brown & Root
Description:
Trolley mounted pumpset, for offshore usage on BP Riser oil platform. Installation included pump, starter, piping, valves and plug/cable.
Performance:
0.5m3/hr (8.04 l/min) at 152 Barg.

NLNG Back-Up Gas Supply Plant

Client:
Shell Petroleum Development Company of Nigeria Ltd
Description:
TEG Re-Circulation & TEG Injection Packages
Performance:
TEG Injection Packages: Two off packages producing up to 0.15 m /hr (2.5 l/min) at 151.0 Barg per pump.

TEG Re-Circulation Packages: Two off packages producing up to 5.51 m 3/hr (92.0 l/min) at 88.0 Barg per pump.