| Client: Total Oil / Halliburton Brown & Root | ![]() |
|
| Description: Two off Arctic Diesel pumpsets, designed to withstand harsh arctic conditions in Northern Russia. Pumps complied with GOST and Gosgortechnezor requirements, for Russian approval |
||
| Performance: 5m3/hr (83 l/min) at 150 Barg. Designed to operate at -20degC and maintain integrity at -54degC under static conditions |
||
Case Studies
Arctic Diesel Oil Pumpsets, Kharyaga Production facility, Russia
ECA Develpoment, BP Cleeton offshore platform.
| Client: BP Exploration & Operating Co. Ltd. / AMEC Process & Energy Ltd | ![]() |
|
| Description: Four off T.E. Glycol pumpsets. Units fitted complete with packing lubrication and high integrity sealing system |
||
| Performance: Belt driven variable speed drive units, producing up to 5.1m3/hr (85 l/min) at 115 Barg. |
||
Glass Dower Soekor Fso
| Client: Bluewater Energy Services BV, Amsterdam | ![]() |
|
| Description: Crude Oil Injection Pump |
||
| Performance: Triplex pump packages: One off package producing up to 75m_/hr at 165 Barg |
||
Methanol Injection Pumpsets for Schiehallion Floating Production & Storage Offshore vessel.
| Client: BP Exploration & Operating Co. Ltd. / Brown & Root | ![]() |
|
| Description: Three high pressure and two chemical dosing Methanol injection pumps, mounted on a common skid. Installation included all process piping and control systems to North Sea Zone 1 hazardous area offshore specifications. |
||
| Performance: Three off inverter driven variable speed units, producing up to 4.7 m 3/hr (78l/min) at 360 Barg per pump. Two off dosing pumps, variable stroke Bran & Luebbe units. |
||
Miscible gas injection pumpsets, Wytch Farm Production facility, Dorset
| Client: BP Exploration & Operating Co. Ltd. / Tri-Ocean Engineering Ltd. | ![]() |
|
| Description: One duty / one standby Propane & Butane mixture pumpsets. |
||
| Performance: Inverter driven variable speed units, producing 55 m 3 / hr (917 l/min) at 120Barg. All equipment designed to withstand low temperature ‘blowdown’ condition. Process fluid temperature 50degC |
||
Mobile test unit for pipeline equipment
| Client: Brown & Root | ![]() |
|
| Description: Trolley mounted pumpset, for offshore usage on BP Riser oil platform. Installation included pump, starter, piping, valves and plug/cable. |
||
| Performance: 0.5m3/hr (8.04 l/min) at 152 Barg. |
||
NLNG Back-Up Gas Supply Plant
| Client: Shell Petroleum Development Company of Nigeria Ltd | ![]() |
|
| Description: TEG Re-Circulation & TEG Injection Packages |
||
| Performance: TEG Injection Packages: Two off packages producing up to 0.15 m /hr (2.5 l/min) at 151.0 Barg per pump. TEG Re-Circulation Packages: Two off packages producing up to 5.51 m 3/hr (92.0 l/min) at 88.0 Barg per pump. |
||






